Mass Convention Center - Boston Common Garage

The BCG Storm Drain Pump System, over 30 years old and in need of replacement to ensure continued operation. The project involves replacing pump mechanisms and controls. The project will remove and replace in kind 19 ejector pumps and 10 pump controllers at the Boston Common Garage. The ejector pumps include 8 Storm ejectors, 4 sanitary sewer ejectors, 1 under slab drain ejector and 6 garage ejector pumps. The project will also provide 2 additional ejector pumps for attic stock.

Engineer: IMEG Corp

General Contractor: Robert W. Irvine & Sons

WEIL Duplex Systems
Design Flow Rate: 150 GPM @ 40′ of TDH
Model Number: 2108
Number of Pumps: 19

Weil Simplex System
Design Flow Rate: 50 GPM @ 25′ of TDH
Model: 1413
Number of Pumps: 3

IMG_6494-Before
System before installation
IMG_7751 After
Weil System after installation