It is always important to understand your application perimeters when selecting fluid handling equipment.
A case study that demonstrates the benefits of a preventative maintenance program.
An office building with a 40+ year old domestic water booster is in need of a replacement.
Luxury hotel needs a quick repair on a broken cooling tower as the summer heat begins to soar.
A residential complex with a preventative maintenance program, benefits from heads up on a end of life system. Knowing when the end of life is coming for fluid handling equipment makes budgeting so much easier.
A water treatment plant receives two new turbine pumps
A bio-tech company replaces failed Variable Frequency Drives (VFDs) with a 24/7/365 schedule.
New Wastewater System for Commercial Building
Town of Franklin, MA replaces a pneumatic ejector pump system with the OverWatch Direct Inline Pump system in their wastewater lift station.
A new fire pump, jockey pump and control panel for a New England based office building
Gustavo Preston Company manages a difficult water booster replacement
Luxury Hotel chain replaces old domestic water booster pump realizing efficiency and cost savings.